G-packer Beverage Filling line can provide you a complete from A to Z turnkey solutions . The engineers of G-packer have over 30 years of working experience and extensive design and construction experience of hundreds of production lines from wordwidely . We can provide each customer with customized
Availability: | |
---|---|
Quantity: | |
Description
This machine can reduce the temperature of hot filling drinks to 36℃-40℃, or increase the temperature of cold filling carbonic acid drinks to 36℃-40℃. It is used in PE bottled hot tea drinks and carbonic acid drinks hot filling production line. This machine can eliminate the condensed water on the external side of bottles, keep bottle clean and dry. It makes bottles easier for labeling and packaging. Productivity: 5000-20000bottles/hour. spray time: about 15-20 minutes.
Spray water cooling machine/bottle cooling machine/spray cooler/cooling tunnel.
The machine is the shower cooler and sterilizer equipment on filling production line. Its suitable for cooling the bottled juice, tea and other energy drinks to keep the quality & flavor of the drinks, and prevent from deformation.
There are 3 areas of temperature on this equipment, which can make the bottled drink cooler step by step. The energy can be well second-birth when the bottled drink cooler step by step drill through the tunnel of this equipment by conveyor chains.
Technical specs
Model | SJ-1 | SJ-2 | SJ-3 | SJ-4 | SJ-5 |
Capacity | 5000bph | 8000bph | 12000bph | 15000bph | 20000bph |
Bottle height | 150-350mm | ||||
The first area cooling time | 7Mins(can be adjusted) | ||||
The second area cooling time | 5 Mins (can be adjusted) | ||||
The third area cooling time | 5 Mins (can be adjusted) | ||||
Working speed of net belt | 590-2950mm/Min | ||||
Input temperature | 82 degree | ||||
Output temperature | 40 degree | ||||
Power of machine | 9.3Kw | 9.7Kw | 9.7Kw | 10.2Kw | 13.2Kw |
Net weight of machine | 2500Kg | 3500Kg | 4500Kg | 6000Kg | 7500Kg |
Dimension of overall | 6000*1500*1800mm | 8000*1500*1800mm | 10000*2000*1800mm | 12000*2000*1800mm | 1500 |
Description
This machine can reduce the temperature of hot filling drinks to 36℃-40℃, or increase the temperature of cold filling carbonic acid drinks to 36℃-40℃. It is used in PE bottled hot tea drinks and carbonic acid drinks hot filling production line. This machine can eliminate the condensed water on the external side of bottles, keep bottle clean and dry. It makes bottles easier for labeling and packaging. Productivity: 5000-20000bottles/hour. spray time: about 15-20 minutes.
Spray water cooling machine/bottle cooling machine/spray cooler/cooling tunnel.
The machine is the shower cooler and sterilizer equipment on filling production line. Its suitable for cooling the bottled juice, tea and other energy drinks to keep the quality & flavor of the drinks, and prevent from deformation.
There are 3 areas of temperature on this equipment, which can make the bottled drink cooler step by step. The energy can be well second-birth when the bottled drink cooler step by step drill through the tunnel of this equipment by conveyor chains.
Technical specs
Model | SJ-1 | SJ-2 | SJ-3 | SJ-4 | SJ-5 |
Capacity | 5000bph | 8000bph | 12000bph | 15000bph | 20000bph |
Bottle height | 150-350mm | ||||
The first area cooling time | 7Mins(can be adjusted) | ||||
The second area cooling time | 5 Mins (can be adjusted) | ||||
The third area cooling time | 5 Mins (can be adjusted) | ||||
Working speed of net belt | 590-2950mm/Min | ||||
Input temperature | 82 degree | ||||
Output temperature | 40 degree | ||||
Power of machine | 9.3Kw | 9.7Kw | 9.7Kw | 10.2Kw | 13.2Kw |
Net weight of machine | 2500Kg | 3500Kg | 4500Kg | 6000Kg | 7500Kg |
Dimension of overall | 6000*1500*1800mm | 8000*1500*1800mm | 10000*2000*1800mm | 12000*2000*1800mm | 1500 |