Views: 0 Author: Site Editor Publish Time: 2025-04-01 Origin: Site
G-PACKER 20T Water treatment system delivered to south Africa
Thanks to the efforts of our delivery staff ,the loading of 2 *40 HP and 1*20 GP was completed in just 3 hours .
G-packer share the same anticipation as the client for the day when the machine is officially installed on -site .water is the source of life as well as wealth ,so that is health water health life .G-packer looks forward to my clients bringing our treated clean water to everywhere in their countires .